Marketing LB

How Do I Automate Email Marketing for My Chiropractic Practice? (Tools + Sequences)

gerek allen headshotby Gerek Allen  ~  Last Updated: November 24th, 2025  ~ 12 Min Read

gerek allen headshotby Gerek Allen
~  Last Updated: November 24th, 2025  ~
~ 12 Min Read  ~

For solo practitioners or small chiropractic practices, your best email automation approach is starting with appointment reminders using platforms like Mailchimp ($13-350/month), Constant Contact ($12-80/month), or your existing practice management software if it has built-in automation. Most practices save 10-15 hours weekly once set up.

Here's the reality: Manual follow-ups are killing your schedule and draining your staff. Between confirming appointments, sending intake forms, checking in with patients, and reactivating those who've disappeared, you're losing 2-3 hours daily on tasks that should run themselves.

For busy practitioners, start with appointment reminders. If patient retention is your problem, prioritize the reactivation sequence. If you want the most comprehensive approach and can invest the setup time, implement the complete system we'll outline below.

Sound fair? Let's break down exactly how to automate your patient communication so you can focus on what you do best.

Table of Contents
    Add a header to begin generating the table of contents

    Why Email Automation Is Non-Negotiable for Modern Chiropractic Practices

    chiropractic email automation system showing automated patient communication workflow saving time

    You're running a healthcare business in 2025, not 1995. Your patients expect timely, relevant communication delivered to the device in their pocket. Without automation, you're either overwhelming your staff or dropping the ball on patient engagement.

    Let's be blunt about what's at stake here.

    The Hidden Cost of Manual Communication

    Every manual phone call, every hand-typed confirmation email, every forgotten follow-up is costing you money. Real money.

    According to research from the Healthcare Information and Management Systems Society, healthcare providers spend an average of 15-20 hours per week on patient communication tasks that could be automated. That's half a full-time employee's workload just handling routine messages.

    For a practice generating $30,000 monthly, that wasted time translates to $3,600-$4,800 in lost productivity every month. Over a year? You're looking at $43,000-$58,000 in opportunity cost.

    Here's what that looks like in your practice:

    • Morning scramble - Front desk calling to confirm today's appointments while new calls go to voicemail
    • New patient chaos - Manually emailing intake forms, forgetting to send pre-visit instructions, patients showing up unprepared
    • Follow-up failures - Meaning to check in with yesterday's first-time patients but getting too busy
    • Reactivation neglect - Having a list of 200 inactive patients but no systematic way to bring them back

    All of these problems evaporate with proper email automation. The system handles routine communications while your team focuses on complex patient needs and in-person care.

    How Automation Actually Increases Patient Satisfaction

    You might think automation makes things less personal. That's backwards.

    Automation ensures no patient falls through the cracks. Everyone gets the same high level of communication, whether your front desk is having a crazy morning or your practice manager is on vacation.

    A study published in the Journal of Medical Internet Research found that automated appointment reminders reduced no-show rates by 38% compared to manual phone call reminders. Patients actually prefer the convenience of text and email reminders they can check on their own schedule.

    Here's what automation does for your patient experience:

    • Consistency - Every new patient gets the same welcoming, professional onboarding experience
    • Timeliness - Follow-ups happen exactly when they should, not when someone remembers
    • Personalization at scale - Automated emails can include patient names, specific appointment details, and relevant health tips based on their conditions
    • 24/7 engagement - Patients receive helpful information between visits, strengthening their connection to your practice

    The chiropractors attracting more patients consistently aren't working harder on communication. They're working smarter with systems that scale.

    The Business Impact: Real Numbers from Real Practices

    Let's talk actual results. According to data from the American Chiropractic Association's practice management surveys, practices with automated patient communication systems report:

    • 23-34% reduction in no-shows through automated appointment reminders
    • 15-22% improvement in patient retention with regular educational nurture sequences
    • 18-25% increase in reactivation rates for lapsed patients compared to manual outreach
    • 40-60% decrease in front desk communication workload freeing staff for higher-value tasks

    For a practice seeing 150 patient visits weekly, reducing no-shows by just 25% means 37.5 more visits monthly. At an average visit value of $65, that's $2,437.50 in additional monthly revenue. Over a year? That's $29,250 in found money.

    And that doesn't count the staff time savings, improved patient satisfaction scores, or increased lifetime value from better retention.

    This isn't theory. This is what happens when you stop hoping patients remember appointments and start systematically nurturing your relationships.

    Understanding Email Automation: What It Actually Does

    email automation system diagram showing different automated patient communication sequences for chiropractors

    Think of email automation as your most reliable digital assistant. It's a system that sends the right message to the right patient at exactly the right time, based on rules you set up once.

    This isn't about blasting generic monthly newsletters to everyone on your list. That's spam dressed up as marketing.

    Real email automation is behavior-triggered, segment-specific communication that feels personal because it's contextually relevant.

    Triggers: What Makes Automation Actually Automatic

    Every automated email needs a trigger - the specific event or condition that tells the system "send this message now."

    Common triggers in chiropractic practices:

    • Time-based triggers - Send birthday email on patient's birthday, send reminder 24 hours before appointment
    • Action-based triggers - Patient books online → send confirmation and intake forms
    • Inactivity triggers - Patient hasn't scheduled in 90 days → start reactivation sequence
    • Milestone triggers - Patient completes 5th visit → request review
    • Date triggers - New year starts → send wellness planning email

    The beauty of triggers is they're always watching. Your system knows when to act even when you're sleeping, treating patients, or on vacation.

    Sequences: The Power of Multi-Touch Communication

    The worst thing you can do with automation is send the same message to everyone. That's not automation - that's lazy broadcasting.

    Segmentation means dividing your patient list into groups based on shared characteristics so you can send more relevant messages.

    Smart segmentation categories for chiropractic practices:

    • Patient stage - New leads, active patients, inactive patients, former patients
    • Treatment focus - Sports injuries, chronic pain, wellness maintenance, pregnancy care
    • Engagement level - Highly engaged, moderately engaged, barely engaged, disengaged
    • Geographic location - For multi-location practices or targeting specific areas
    • Service type - Adjustment-only, massage combo, rehab program participants

    A sports injury patient shouldn't get the same content as a prenatal patient. An active patient who comes weekly doesn't need the same reactivation message as someone you haven't seen in six months.

    Segmentation makes automation feel personal because it is personal.

    (20251117) iTechValet_Free Audit_reviseds (Update)-57
    NEED MORE CLIENTS?
    Free conversion-focused analysis uncovers the 3 biggest problems killing your bookings — we'll walk you through your results personally

    Why visitors leave without booking

    What's broken on mobile devices

    Missing trust signals costing you clients

    Where you rank vs local competitors

    How to get more calls this month

    Identifying competitor advantages

    Choosing the Right Email Automation Platform for Your Practice

    comparing email automation platforms and practice management software options for chiropractors

    Not all email platforms are created equal. Some are built for e-commerce. Some for B2B sales. Some for healthcare specifically.

    You need a platform that handles your unique needs without making you feel like you need a computer science degree.

    Standalone Email Marketing Platforms

    These are dedicated email tools that do one thing really well: email marketing and automation.

    Mailchimp - The most popular option for small businesses, with a generous free tier (up to 500 contacts). Monthly cost ranges from $13-350 depending on list size and features.

    Pros: User-friendly drag-and-drop builder, extensive template library, solid automation features, integrates with most practice management software.

    Cons: Can get expensive as your list grows, not specifically built for healthcare, requires separate practice management system.

    Best for: Solo practitioners or small practices (1-2 chiropractors) who want powerful, affordable email automation and already have practice management covered.

    Constant Contact - Another popular choice with excellent customer support and healthcare-friendly features. Pricing runs $12-80 monthly for most small practices.

    Pros: Excellent phone and chat support, simple to learn, good deliverability rates, HIPAA-compliant options available.

    Cons: Slightly less sophisticated automation than Mailchimp, fewer integration options, can feel dated compared to newer platforms.

    Best for: Practices that value hand-holding and support over cutting-edge features, especially if you're not super tech-savvy.

    ActiveCampaign - More advanced automation capabilities with CRM features built in. Pricing starts around $29/month but typically runs $79-229 for practices.

    Pros: Powerful automation builder, excellent segmentation, built-in CRM for lead management, sophisticated reporting.

    Cons: Steeper learning curve, more expensive, might be overkill for basic needs.

    Best for: Practices with 3+ locations or aggressive growth plans that need advanced marketing automation and lead nurturing.

    Practice Management Software with Built-In Email

    Many modern practice management systems now include email automation features. If you're already using one of these platforms, start there before paying for separate email software.

    Jane App - Comprehensive practice management with solid email automation. Pricing runs $79-149/month depending on features.

    Pros: Everything in one place (scheduling, charting, billing, email), excellent patient experience, purpose-built for healthcare.

    Cons: Email features not as robust as dedicated platforms, higher base cost, might be overkill if you just need email.

    Best for: Practices ready to upgrade to complete practice management with email as a bonus feature.

    SimplePractice - Popular all-in-one system with telehealth, billing, scheduling, and email automation. Runs $29-99/month.

    Pros: Full practice management suite, user-friendly, includes telehealth capabilities, good mobile app for practitioners.

    Cons: Email automation is basic compared to dedicated platforms, primarily built for mental health (but works for chiropractic).

    Best for: Solo practitioners wanting everything in one affordable package without complexity.

    Kareo - Larger platform with medical billing focus plus email capabilities. Pricing varies based on practice size.

    Pros: Robust billing and insurance features, enterprise-grade security and HIPAA compliance, scalable for growing practices.

    Cons: Expensive, complex setup, email is secondary feature not primary focus.

    Best for: Multi-provider practices with heavy insurance billing needs who want consolidated software.

    Platform Selection Framework: What Actually Matters

    Stop getting paralyzed by comparing 47 features you'll never use. Here's what actually matters when choosing a platform:

    Ease of Use You'll actually use simple tools; complex ones collect dust Can you figure out how to send a test email in under 10 minutes?
    Automation Builder The visual workflow builder is your automation control center Does it have a visual automation builder or just basic "send newsletter" options?
    HIPAA Compliance Required for healthcare practices handling protected health information Does the platform offer a Business Associate Agreement (BAA)?
    Integration Options Needs to connect with your practice management software and website Does it integrate with your existing systems?
    Cost vs. Features More expensive doesn't always mean better for your specific needs Does it have the 3-4 features you actually need without paying for 30 you won't use?

    For most practices, start with your existing practice management software if it has email automation. If it doesn't, or the features are too limited, Mailchimp or Constant Contact are your best bet for standalone solutions.

    Don't overthink this. Pick one and launch. You can always switch later once you know what you actually need versus what you thought you needed.

    The Essential Email Automations Every Chiropractic Practice Needs

    seven essential automated email sequences for chiropractic patient engagement and retention

    You don't need 37 different automations. You need 5-7 that actually move the needle.

    Here's what to build first, in priority order based on impact.

    Priority #1: Appointment Reminder Automation

    No-shows are expensive. According to data from the Medical Group Management Association, the average cost of a no-show appointment for healthcare providers is $200 when you factor in lost revenue and wasted staff time.

    For a practice with 120 weekly appointments and a 15% no-show rate, that's 18 missed appointments weekly costing $3,600. Over a year? $187,200 in lost revenue.

    Automation setup:

    • First reminder - 72 hours before appointment (email and text if possible)
    • Second reminder - 24 hours before appointment (email and text)
    • Content includes - Date/time, doctor name, office address with map link, phone number for rescheduling, parking instructions if relevant

    Why 72 and 24 hours? The 72-hour reminder gives patients enough notice to reschedule if needed without leaving a hole in your schedule. The 24-hour reminder catches anyone who saw the first one but forgot to add it to their calendar.

    Pro tip: Include a direct link to reschedule or cancel online. Yes, you might lose a few appointments, but you'll fill those slots with other patients instead of having surprise no-shows. Practices with online rescheduling options see 40% fewer no-shows according to healthcare scheduling data.

    This automation alone justifies the cost of your entire email system.

    Priority #2: New Patient Welcome Sequence

    First impressions matter. A lot.

    Research in patient satisfaction shows that patients who receive structured onboarding communication before their first visit have 30% higher retention rates through their first year of care.

    Your welcome sequence should reduce anxiety, set expectations, and make new patients feel like they made the right choice.

    Email 1 - Immediate confirmation (triggered when appointment is booked):

    • Confirm appointment details (date, time, location)
    • Express excitement about meeting them
    • Include what to bring (insurance cards, ID, comfortable clothing)
    • Link to parking and office photos
    • Estimated appointment duration

    Email 2 - Intake forms (sent 3-4 days before appointment):

    • Direct link to online intake forms with explanation of why you're requesting certain information
    • Brief overview of what to expect during first visit
    • Link to "Meet the Team" page or short video introducing staff
    • Reminder of appointment details

    Email 3 - Day-before final reminder (sent 24 hours before):

    • Friendly reminder with enthusiasm
    • Brief mention of what they've hopefully already completed (intake forms)
    • Your photo with personal message
    • Office phone number for any last-minute questions
    • Parking instructions repeated

    This sequence transforms nervous new patients into confident, prepared ones who show up on time with paperwork complete.

    Priority #3: Post-Appointment Follow-Up

    The 24-48 hours after an adjustment are critical. Patients might be sore. They might have questions. They might be feeling amazing and want to tell someone.

    This is your window to reinforce their decision to come in and address any concerns before they turn into negative reviews or dropouts.

    Automation setup (triggered 24 hours after appointment):

    Subject line options:

    • "How are you feeling today, [Name]?"
    • "Quick check-in after your adjustment"
    • "Your recovery resources from [Practice Name]"

    Email content should include:

    • Personal greeting using their name
    • Specific mention of what you worked on (if your system can pull this automatically, otherwise keep general)
    • What's normal post-adjustment (mild soreness, increased mobility, hydration reminders)
    • Link to helpful stretches or exercises specific to their condition
    • Direct line to reach you with questions or concerns
    • Gentle reminder to schedule next appointment if they haven't already

    Advanced version: Segment based on patient type. Sports injury patients get different post-care instructions than chronic pain or prenatal patients.

    This follow-up shows you care beyond the treatment room and positions you as a partner in their healing, not just a service provider. Practices using systematic follow-ups see 25% fewer concerned phone calls and 18% better online reviews according to patient communication studies.

    Priority #4: Reactivation Campaign for Inactive Patients

    Your patient database is sitting on tens of thousands of dollars in lost revenue. Patients who used to come in regularly but stopped.

    Some moved away. Some switched to another chiropractor. But many just got busy and forgot, or felt weird about coming back after being gone so long.

    A smart reactivation campaign makes it easy for them to come back without the awkwardness.

    Automation setup (triggered 90 days after last appointment for patients with 3+ prior visits):

    Email 1 - Friendly check-in (Day 1):

    • Subject: "We miss seeing you, [Name]"
    • Acknowledge they haven't been in for a while
    • No guilt, no pressure, just genuine "hope you're doing well"
    • Subtle reminder of what you worked on together
    • Simple question: "How's your [condition] doing?"

    Email 2 - Educational value (Day 14):

    • Subject: "Quick reminder about maintenance care"
    • Share article or video about why regular adjustments matter
    • Educational focus, not sales pitch
    • Include patient success story (with permission)

    Email 3 - Special incentive (Day 28):

    • Subject: "We'd love to see you back"
    • Brief welcome-back offer (discounted adjustment, free consultation, included massage)
    • Clear call-to-action with easy scheduling link
    • Expiration date to create urgency (30-45 days out)

    Email 4 - Final touchpoint (Day 42):

    • Subject: "Before we close your file..."
    • Last chance message letting them know you're about to archive their records
    • No hard feelings tone
    • Easy one-click "I want to stay active" button

    Important: Stop the sequence if they book an appointment at any point. Nothing worse than getting a "we miss you" email the day before your scheduled appointment.

    According to chiropractic practice management benchmarks, well-executed reactivation campaigns bring back 15-20% of inactive patients. For a practice with 400 inactive patients, that's 60-80 returned patients worth $39,000-$52,000 in annual revenue at average visit values.

    Those patients are already sold on you. You're just reminding them you exist and making it easy to come back.

    Priority #5: Educational Nurture Sequence

    Patients who understand the value of regular chiropractic care stay longer and refer more people.

    Your job isn't just to adjust spines. It's to educate patients on why ongoing care matters for their long-term health.

    Monthly educational email strategy:

    Create segments based on patient interests and conditions, then send targeted content:

    • Sports injury segment - Injury prevention tips, performance optimization, recovery strategies
    • Chronic pain segment - Pain management techniques, lifestyle adjustments, success stories
    • Wellness segment - Posture tips, stress management, healthy aging strategies
    • Prenatal segment - Pregnancy-specific adjustments, postpartum care, baby wellness

    Content mix for educational emails:

    • 40% - Practical tips they can implement immediately
    • 30% - Explanations of how chiropractic care works
    • 20% - Patient success stories and testimonials
    • 10% - Practice updates and team spotlights

    Frequency: Monthly is the sweet spot for educational content. Weekly is too much for busy patients. Quarterly lets them forget you exist.

    Strong educational content establishes you as the trusted health authority in your community. This is what turns one-time patients into lifelong advocates who refer everyone they know. The best part about building your online reputation is that educated patients leave better, more detailed reviews.

    Priority #6: Review and Referral Request Automation

    Here's an uncomfortable truth: Most happy patients never think to leave you a review or tell their friends about you. Not because they don't love you - they're just busy and it doesn't cross their mind.

    You have to ask. Systematically.

    Automation setup (triggered after 5th visit for patients with consistent attendance):

    Email 1 - Review request:

    • Subject: "Can you help others find great care?"
    • Personal message about how reviews help people in pain find quality practitioners
    • Explain impact: "When potential patients read reviews from real people like you, they feel more confident choosing our practice"
    • Direct links to Google Business Profile, Facebook, and Yelp (prioritize Google)
    • Make it ridiculously easy - one click to review page

    Pro tip: Don't ask for reviews immediately after the first visit. Wait until patients have experienced real results (typically 5-6 visits in). They'll have more to say and be more enthusiastic.

    Email 2 - Referral encouragement (sent separately, 2 weeks after review request):

    • Subject: "Know someone dealing with [condition]?"
    • Brief explanation that word-of-mouth referrals are your best source of new patients
    • Share that you have immediate availability for new patients
    • Include referral cards PDF they can print or forward
    • Optional: Small thank-you gift for successful referrals (coffee gift card, etc.)

    According to consumer behavior research, 72% of patients will leave a review if asked directly by their healthcare provider. Without asking? That drops to 12%.

    The math is simple: Every month you delay implementing review requests, you're losing 5-10 potential 5-star reviews that could've attracted 15-30 new patient inquiries.

    When you combine strong reviews with effective social media engagement, you create a powerful online presence that attracts patients on autopilot.

    Priority #7: Birthday and Anniversary Messages

    This one's the easiest win in your entire automation system. People love being remembered on their birthday or care anniversary.

    Birthday automation (triggered on patient's birthday):

    • Simple "Happy Birthday from [Practice Name]" message
    • Personal note from you as the doctor
    • Optional: Small gift (10% off supplements, free add-on service with next visit)
    • No hard sell - just genuine celebration

    Care anniversary automation (triggered on anniversary of first visit):

    • "It's been one year since you started your journey with us"
    • Brief reflection on their progress or changes you've seen
    • Appreciation for their trust in your care
    • Optional: Fun stat ("We've seen you 37 times this year - that's dedication!")

    These relationship-building emails cost virtually nothing to send but generate enormous goodwill. Patients share birthday emails on social media, tag your practice, and tell their friends "my chiropractor remembered my birthday!"

    It's the little things that make people feel valued.

    Organizing Your Patient List for Effective Automation

    organized patient email list segmentation system showing different categories for targeted automation

    Your automation is only as good as your patient data. Garbage in, garbage out.

    Before you launch a single automated email, you need to clean up and organize your list.

    Core Patient Segments Every Practice Needs

    At minimum, divide your patient database into these three critical segments:

    New Leads (haven't booked first appointment yet):

    These are people who downloaded a resource, called for info, filled out a contact form, or expressed interest but haven't scheduled.

    • Typical segment size: 50-200 contacts depending on your marketing activity
    • Communication focus: Education about your approach, social proof, easy scheduling
    • Goal: Convert to first appointment
    • Automation needs: Lead nurture sequence, educational content about chiropractic benefits

    Active Patients (appointment within last 90 days):

    Your current patient base who are actively receiving care.

    • Typical segment size: 150-500 patients depending on practice size
    • Communication focus: Appointment reminders, post-care follow-up, wellness education
    • Goal: Maintain engagement and maximize lifetime value
    • Automation needs: Reminder sequences, follow-up emails, educational newsletters

    Inactive Patients (no appointment in 90+ days, but 3+ prior visits):

    Former regular patients who've stopped coming in. Your biggest opportunity for quick wins.

    • Typical segment size: 200-800 patients (grows if you don't systematically reactivate)
    • Communication focus: Reengagement, reminder of benefits, special comeback offers
    • Goal: Reactivate 15-20% back to active status
    • Automation needs: Reactivation campaigns, milestone check-ins

    Why 90 days is the cutoff: Most treatment plans involve visits every 2-4 weeks. If someone hasn't been in for 90 days, they've missed 3-6 scheduled or expected visits. They're no longer in an active care pattern.

    Advanced Segmentation for Sophisticated Practices

    Once you've got the basics running, layer in additional segments for more targeted communication:

    By condition or service type:

    • Sports injury patients
    • Chronic pain management
    • Prenatal/postpartum care
    • Wellness maintenance
    • Auto accident/personal injury

    By engagement level:

    • Highly engaged (opens emails, responds, active on social)
    • Moderately engaged (opens occasionally, visits regularly)
    • Low engagement (rarely opens, sporadic visits)

    By lifetime value:

    • VIP patients (high-frequency visitors, long tenure, multiple referrals)
    • Standard patients (regular care, consistent)
    • One-and-done (came once, never returned)

    The more specific your segments, the more relevant your automated messages become. And relevance is what keeps people reading instead of unsubscribing.

    Building segmentation into your content strategy makes everything more effective, from your blog content to your patient communications.

    Data Hygiene: Cleaning Up Your List

    Before you send automated emails to thousands of contacts, clean your database.

    Remove these immediately:

    • Duplicate entries (same person listed multiple times with different emails)
    • Obviously fake emails ([email protected], [email protected])
    • Role-based emails ([email protected], [email protected])
    • Hard bounces from previous sends

    Update and verify:

    • Current phone numbers for text message integrations
    • Correct patient names (check for typos, autocorrect mistakes)
    • Accurate appointment history and visit dates
    • Proper consent status (opt-in confirmed)

    Tag with key information:

    • Date of first visit
    • Primary condition/reason for care
    • Referral source (how they found you)
    • Preferred contact method

    Most email platforms will automatically handle hard bounces and unsubscribes for you. But duplicate removal and data verification requires manual work upfront.

    Plan on 4-8 hours to properly clean and segment a database of 500-1000 contacts. It's boring work. Do it anyway. The difference between a clean, segmented list and a messy one is the difference between 25% open rates and 8% open rates.

    Implementing Your First Email Automation: Step-by-Step Process

    eight-step implementation process for launching first automated email sequence in chiropractic practice

    Stop overthinking it. Here's exactly how to get your first automation running this week.

    Step 1: Choose Your Platform (1-2 Hours)

    Review the platform section earlier in this guide and make a decision.

    If you're stuck between two options, flip a coin. Seriously. The difference between platforms is smaller than the difference between having automation and not having automation.

    Quick decision framework:

    • Already have practice management software with email? → Use that
    • Want simple and cheap for a small practice? → Mailchimp
    • Need hand-holding and great support? → Constant Contact
    • Want advanced features and don't mind complexity? → ActiveCampaign

    Sign up for the free trial or lowest tier to start. You can always upgrade later.

    Step 2: Export and Clean Your Patient List (2-3 Hours)

    Export your patient contact list from your practice management system.

    Most systems let you export to CSV (comma-separated values file) that you can open in Excel or Google Sheets.

    Cleaning process:

    1. Remove obvious duplicates
    2. Delete incomplete records (no email address)
    3. Fix obvious typos in names and emails
    4. Add a "status" column: New Lead, Active Patient, or Inactive Patient
    5. Add "first_visit_date" column if you have this data
    6. Save cleaned file as new CSV

    Don't stress about perfect data. Get it "good enough" and you can always improve it later.

    Step 3: Import Your List and Create Basic Segments (1 Hour)

    Import your cleaned CSV into your email platform.

    Most platforms have a simple import wizard that walks you through matching your spreadsheet columns to their fields.

    Create your three core segments immediately:

    • Active Patients (if you have a last_visit_date column, filter for last 90 days)
    • Inactive Patients (filter for 90+ days since last visit)
    • New Leads (everyone without a first_visit_date)

    If your data isn't sophisticated enough for automatic segmentation yet, just import everyone and manually tag 10-20 people in each segment to test your automations before full launch.

    Step 4: Choose Your First Automation to Build

    Pick ONE automation from the priorities we outlined earlier.

    Best choice for most practices: Appointment reminders

    Why start here? Immediate, measurable impact on your biggest revenue leak (no-shows). Plus it's simple to build and hard to screw up.

    Second best choice: New patient welcome sequence

    Why this works: Improves first-visit experience, reduces patient anxiety, establishes you as organized and professional from day one.

    Don't try to build all seven automations at once. Master one, get it running smoothly, then add the next.

    Step 5: Write Your Email Content (2-3 Hours)

    Time to write the actual emails. Don't overthink it.

    For appointment reminders, you need two emails:

    Email 1 (72 hours before):

    Subject: "Appointment Reminder: [Day], [Date] at [Time]"

    Body:

    Hi [First Name],

     

    Just a friendly reminder about your upcoming appointment:

     

    [Day], [Date] at [Time]

    With Dr. [Doctor Name]

    [Office Address]

    [Map Link]

     

    Need to reschedule? Call us at [Phone] or use this link: [Reschedule Link]

     

    Looking forward to seeing you!

     

    [Practice Name]

    [Phone Number]

     

    Email 2 (24 hours before):

    Subject: "Tomorrow: Your appointment at [Time]"

    Body:

    Hi [First Name],

     

    Quick reminder that we'll see you tomorrow:

     

    [Date] at [Time]

    [Office Address]

    Parking: [Brief parking instructions]

     

    Questions? Call us at [Phone]

     

    See you soon!

     

    [Practice Name]

     

    Notice: Short, clear, essential information only. No fluff. No marketing pitch. Just helpful reminders.

    Step 6: Build Your Automation Workflow (1 Hour)

    This is where you set up the trigger and timing in your email platform.

    For appointment reminder automation:

    1. Navigate to "Automations" or "Workflows" in your platform
    2. Choose "Create New Automation"
    3. Select trigger: "Appointment scheduled" or "X days before appointment date"
    4. Add first email: 72 hours (3 days) before appointment
    5. Add second email: 24 hours (1 day) before appointment
    6. Set to skip if appointment is cancelled or rescheduled
    7. Save workflow

    Most platforms have visual workflow builders that make this intuitive. You're basically drawing a flowchart.

    If your practice management software doesn't automatically trigger based on appointments, you'll need to manually add patients to the automation when they book. More work, but still way better than manual reminders.

    Step 7: Test Everything Thoroughly (30 Minutes)

    Never, EVER launch an automation without testing it first.

    Testing process:

    1. Add yourself as a test contact
    2. Manually trigger the automation for your test contact
    3. Verify you receive the emails at the right timing
    4. Check all links work correctly
    5. Confirm personalization fields populate correctly ([First Name] shows actual name, not code)
    6. Test on both desktop and mobile devices
    7. Check emails land in inbox, not spam

    Have 2-3 staff members test as well. Different email providers (Gmail, Outlook, Yahoo) handle things differently.

    Fix anything broken before launching to real patients.

    Step 8: Launch and Monitor Performance (Ongoing)

    Turn on your automation for your active patient segment.

    Don't launch to everyone at once if you're nervous. Start with 50-100 patients to verify everything works as expected.

    Key metrics to monitor in first 30 days:

    • Delivery rate - Are emails actually getting delivered? (Should be 95%+)
    • Open rate - Are people opening reminders? (Healthcare averages 20-25%)
    • Click rate - Are they clicking reschedule links? (3-5% typical)
    • No-show rate - The whole point - did it actually decrease?

    Week 1: Check daily to catch any issues quickly

    Week 2-4: Check 2-3 times per week

    Month 2+: Review weekly, adjust as needed

    Most platforms have dashboards showing these metrics automatically. You're not doing math by hand.

    If open rates are below 15% or delivery is below 90%, something's wrong. Email your platform's support team for help troubleshooting.

    Common Email Automation Mistakes (And How to Avoid Them)

    common email automation mistakes versus correct implementation for chiropractic practices

    You're going to make mistakes. Everyone does. Here are the big ones to avoid.

    Mistake #1: Making Everything Sound Like a Robot Wrote It

    Automated doesn't mean robotic.

    Bad example: "Dear valued patient, this automated message is to inform you of your scheduled appointment on [date] at [time]. Please confirm receipt of this communication."

    Sounds like a parking ticket notice. Nobody wants to read that.

    Good example: "Hey [Name], just a quick heads up that we'll see you Thursday at 2pm. Looking forward to it! Let us know if you need to reschedule."

    Write like a human talking to another human. Use contractions. Be friendly. Sound like yourself.

    Pro tip: Read your emails out loud before launching. If it sounds weird spoken, it'll sound weird in someone's inbox.

    Mistake #2: Sending Too Many Emails Too Quickly

    Enthusiasm is great. Overwhelming your patients is not.

    If someone books an appointment, they don't need:

    • Immediate confirmation email
    • Welcome to practice email 10 minutes later
    • Intake forms email 2 hours later
    • Team introduction video the next morning
    • Pre-appointment instructions that afternoon

    That's email harassment, not automation.

    Smart spacing for new patient sequences:

    • Email 1: Immediate confirmation (within 5 minutes of booking)
    • Email 2: Intake forms and preparation (3-4 days before appointment)
    • Email 3: Final reminder (24 hours before appointment)

    Give people breathing room between emails. Nobody checks email every hour excited to hear from their chiropractor again.

    Mistake #3: Forgetting to Set Stop Conditions

    This is the most embarrassing automation fail.

    Scenario: Patient books appointment. They get welcome sequence. Then they reschedule. Now they're getting emails about an appointment that doesn't exist anymore. Then they show up for their appointment and immediately get a "We miss you" reactivation email the next day.

    Always set conditions to stop inappropriate emails:

    • Stop welcome sequence if appointment is cancelled
    • Stop reactivation sequence if patient books appointment
    • Stop birthday email if patient requested no contact
    • Stop reminder sequence if appointment already happened

    Most platforms call these "exit conditions" or "stop triggers." Use them religiously.

    Mistake #4: Never Updating or Improving Your Emails

    You launch your automations in January. By December, nothing's changed even though you've learned a ton about what works.

    Set quarterly reviews of your automations:

    • What are open rates? Going up or down?
    • What are click rates? Which links get clicked most?
    • Are people unsubscribing? At what point in sequences?
    • What feedback have you received from patients?

    Small tweaks compound. Changing a subject line from "Appointment Tomorrow" to "See You Tomorrow at [Time]" might increase opens by 15%. That's 45 more patients reading your reminder emails every month.

    Mistake #5: Not Segmenting Enough (or Segmenting Too Much)

    There's a balance here.

    Too little segmentation: Sending the same email about sports injury prevention to your 73-year-old patient with chronic back pain and your 22-year-old college athlete.

    Too much segmentation: Creating 47 different micro-segments and customized emails for every possible patient scenario, burning yourself out on complexity.

    Sweet spot: 4-6 meaningful segments based on patient stage (new/active/inactive) plus 2-3 condition-based segments for your most common patient types.

    You can always add more sophisticated segmentation later. Start simple, prove value, then get fancy.

    Measuring Success: Email Automation Metrics That Actually Matter

    email automation performance metrics dashboard showing key success indicators for chiropractic practice

    Numbers don't lie. Here's what to track and what success actually looks like.

    Email Deliverability Rate (Goal: 95%+)

    This measures what percentage of your emails actually make it to inboxes versus bouncing or being rejected.

    Why it matters: If only 60% of your emails are being delivered, your amazing content doesn't matter. Nobody's seeing it.

    What affects deliverability:

    • Email list quality (clean vs. full of old/invalid addresses)
    • Sender reputation (has your domain been flagged for spam before?)
    • Content quality (avoid spam trigger words, excessive links)
    • Authentication setup (SPF, DKIM, DMARC - your platform handles most of this)

    How to fix low deliverability:

    • Clean your list quarterly (remove hard bounces, inactive subscribers)
    • Never buy email lists (instant reputation killer)
    • Make unsubscribing easy (hiding unsubscribe = spam complaints = bad reputation)
    • Warm up new accounts slowly (don't send 1000 emails first day)

    Most reputable platforms maintain good deliverability automatically. If yours drops below 90%, contact support immediately.

    Open Rate (Healthcare Average: 20-25%)

    The percentage of delivered emails that get opened.

    What this tells you: Are your subject lines compelling? Do patients recognize your sender name? Is your timing right?

    Benchmark expectations:

    • 25-30%: Excellent (you're crushing it)
    • 20-25%: Good (industry average)
    • 15-20%: Needs improvement
    • Below 15%: Something's seriously wrong

    What affects open rates:

    • Subject line quality (specific and relevant beats generic)
    • Sender name recognition (comes from "Practice Name" not "[email protected]")
    • Send timing (Tuesday-Thursday mornings typically best for healthcare)
    • Email frequency (weekly overwhelms, monthly gets forgotten, test your audience)

    Quick wins to improve open rates:

    • Use patient's first name in subject when appropriate
    • Keep subject lines under 50 characters (mobile truncates longer)
    • Test different send times (morning vs. afternoon vs. evening)
    • Segment more aggressively so content is more relevant

    Don't obsess over open rates. A 30% open rate sending valuable content beats a 50% open rate sending garbage nobody acts on.

    Click-Through Rate (Healthcare Average: 3-5%)

    The percentage of people who click links in your emails.

    What this tells you: Is your content compelling enough to drive action? Are your calls-to-action clear?

    What counts as a click:

    • Appointment scheduling link
    • Link to blog post or video
    • Review request link
    • "Reply to this email" (if tracked)
    • Phone number click on mobile

    Why healthcare CTR is lower than other industries: You're not selling products. You're building relationships. Most emails have educational value without requiring clicks.

    When to worry about low CTR:

    • Appointment reminder emails below 2% (people should click to reschedule/confirm)
    • Review request emails below 5% (if they're opening but not clicking, your ask needs work)
    • Promotional emails below 3% (limited-time offers should drive action)

    How to improve CTR:

    • Use one primary call-to-action per email (not five competing links)
    • Make buttons big and obvious (tiny text links get ignored on mobile)
    • Create urgency when appropriate (limited-time offers, appointment availability)
    • A/B test different CTA copy ("Book Now" vs. "Schedule Your Visit" vs. "Claim Your Spot")

    Appointment Booking Rate from Email (Goal: Varies by Email Type)

    The ultimate metric: How many appointments get booked as a result of your emails?

    Most email platforms can't track this automatically. You'll need to either:

    • Ask new patients "How did you hear about us?" and track "email reminder" or "reactivation email"
    • Use UTM parameters in booking links to track source in Google Analytics
    • Manually compare booking increases during campaign periods

    Realistic expectations:

    • Appointment reminders: Not about new bookings, about reducing no-shows
    • New patient welcome: 85-90% should show for first appointment (up from 70-75% without sequence)
    • Reactivation campaigns: 15-20% conversion to booked appointment is excellent
    • Educational newsletters: 2-5% book appointments from each send

    This is where ROI becomes obvious. If a reactivation campaign to 400 inactive patients brings back 60 patients (15%) who each come in 8 times annually at $65 per visit, that's $31,200 in recovered revenue from sending some emails.

    Unsubscribe Rate (Acceptable: Below 0.5% Per Email)

    The percentage of recipients who opt out of future emails.

    What this tells you: Are you sending too frequently? Is content irrelevant? Are you being too salesy?

    When to worry:

    • Above 1% per email: Major problem, investigate immediately
    • Above 0.5%: Warning sign, review content and frequency
    • 0.2-0.5%: Normal, some attrition is expected
    • Below 0.2%: Healthy list

    Common unsubscribe triggers:

    • Sending too frequently (daily emails will kill your list)
    • Broken promises (signed up for appointment reminders, getting sales pitches)
    • Irrelevant content (sending prenatal care tips to 60-year-old male patients)
    • Poor mobile experience (emails that don't display properly on phones)

    Pro tip: Include a preferences center where people can choose email frequency or topics instead of fully unsubscribing. Many platforms offer this feature. You'd rather someone get monthly emails than no emails.

    Some unsubscribes are healthy. People move, switch practitioners, or legitimately don't want emails. That's fine. You want an engaged list, not a massive list of people who ignore you.

    Time Savings (Goal: 10-15+ Hours Per Week)

    This one's harder to quantify but arguably most important for busy practitioners.

    How to measure:

    • Time your staff spent on manual appointment confirmations before automation (typically 1-2 hours daily)
    • Time spent manually following up with new patients (30-60 minutes daily)
    • Time spent calling inactive patients (2-4 hours weekly if you even did this)

    Expected time savings once fully implemented:

    • Appointment reminders: 7-10 hours weekly
    • New patient follow-up: 3-5 hours weekly
    • Reactivation outreach: 4 hours monthly
    • Educational content distribution: 2 hours monthly

    Total: 10-15 hours per week your team can redirect to higher-value activities like answering complex patient questions, handling billing issues, or improving in-office experience.

    That's equivalent to hiring a half-time employee just for communications. Except it costs $50-200 monthly instead of $15,000-$20,000 annually.

    When evaluating automation ROI, don't just count new patients. Count recovered time and prevented revenue loss from no-shows.

    Integrating Email Automation with Your Complete Marketing Strategy

    integrated chiropractic marketing strategy showing email automation connected with other marketing channels

    Email automation isn't a standalone tactic. It's one piece of your larger patient acquisition and retention system.

    Here's how it fits together.

    Email + Website: The Foundation

    Your website and email automation work together to convert visitors into patients.

    How they connect:

    • Website captures leads (download resources, contact forms, online booking)
    • Email automation nurtures those leads until they're ready to book
    • Website provides the content your emails link to (blog posts, videos, service pages)
    • Email drives traffic back to website for educational content

    Integration checklist:

    • Website has clear opt-in forms for email list (offer something valuable in exchange)
    • Every blog post includes email signup opportunity
    • Email signature includes website link
    • Landing pages exist for email campaign offers

    Practices with strong website foundations and conversion optimization see 3-5x better results from email marketing because the website converts the traffic email generates.

    Email + Social Media: Amplification Strategy

    Social media and email serve different purposes but reinforce each other beautifully.

    Social media: Builds awareness, engages community, attracts new followers

    Email: Delivers deeper value, drives action, maintains connection with engaged audience

    How to integrate:

    • Repurpose email content as social media posts
    • Use social media to grow your email list (run contests, share valuable downloads)
    • Include social media links in email signature
    • Share patient success stories across both channels (with permission)

    Example integrated campaign:

    1. Create valuable guide: "10 Exercises for Lower Back Pain Relief"
    2. Post teaser on social media with link to download full guide
    3. Download requires email address
    4. Email automation delivers guide plus 3 follow-up emails with additional tips
    5. Final email invites them to book assessment appointment

    Social brings awareness. Email drives conversion. Together they're powerful.

    Email + Reviews: Trust Building Combination

    Online reviews and email automation create a self-reinforcing cycle.

    The cycle:

    1. Automated email requests reviews from happy patients
    2. Positive reviews attract new patients who find you online
    3. New patients receive automated welcome sequence improving their experience
    4. Great experience leads to more positive reviews
    5. Repeat

    Make it systematic:

    • Email automation requests review after 5-6 visits
    • Thank-you email sent automatically when someone leaves review
    • Monthly email showcases recent positive reviews (social proof for current patients)
    • New patient welcome sequence includes reviews as trust-building element

    The practices dominating local search results aren't lucky. They're systematic about requesting and leveraging reviews through email automation.

    Email + Referral Programs: Turning Patients into Advocates

    Your best new patients come from referrals from existing patients. Email automation scales this.

    Referral email strategy:

    • Automated email 3-4 months into patient relationship (after they've experienced real results)
    • Monthly reminder email to VIP patients about referral incentives
    • Automated thank-you email when referred patient books (sent to referring patient)
    • Quarterly "referral champion" recognition email highlighting top referrers

    Referral incentive ideas:

    • Both referring patient and new patient get $20 credit
    • Free massage add-on after 3 successful referrals
    • Entry into quarterly drawing for larger prize
    • Donation to local charity in their name

    Email makes it easy to systematically remind patients you welcome referrals without being pushy about it in person.

    Next Steps: Launching Your Email Automation This Week

    four-week email automation implementation timeline for chiropractic practice showing weekly progress stages

    You've got the knowledge. Now you need the plan.

    Here's your week-by-week implementation roadmap to get your first automation running within 30 days.

    Week 1: Foundation Setup

    Days 1-2: Platform decision and setup

    • Review platform options (2 hours)
    • Choose one and sign up for trial or entry-level plan (30 minutes)
    • Complete basic account setup (1 hour)

    Days 3-5: Data preparation

    • Export patient list from practice management system (30 minutes)
    • Clean data in spreadsheet (3 hours)
    • Import to email platform and create basic segments (1 hour)

    Days 6-7: First automation planning

    • Decide which automation to build first (recommendation: appointment reminders)
    • Draft email copy for your chosen automation (2 hours)
    • Get feedback from staff or partner on email content (30 minutes)

    Week 1 total time investment: 10-12 hours

    Week 2: Build and Test

    Days 8-10: Automation construction

    • Build your automation workflow in platform (1-2 hours)
    • Add your email content to workflow (1 hour)
    • Set up triggers and timing conditions (1 hour)

    Days 11-13: Testing phase

    • Add yourself and 2-3 staff as test contacts (15 minutes)
    • Trigger test automation for all test contacts (15 minutes)
    • Verify emails arrive correctly with proper formatting and working links (30 minutes)
    • Fix any issues discovered during testing (1-2 hours)

    Day 14: Final review

    • Have uninvolved staff member review everything fresh (30 minutes)
    • Double-check all personalization fields populate correctly (15 minutes)
    • Confirm stop conditions are set properly (15 minutes)

    Week 2 total time investment: 6-8 hours

    Week 3: Soft Launch

    Days 15-17: Limited rollout

    • Activate automation for 50-100 active patients only (not full list yet) (30 minutes)
    • Monitor delivery and open rates closely (15 minutes daily)
    • Watch for any error reports or patient confusion (15 minutes daily)

    Days 18-21: Gather feedback and adjust

    • Ask front desk if they're hearing any patient feedback about emails (ongoing)
    • Review metrics dashboard (open rates, click rates, deliverability) (30 minutes)
    • Make adjustments to copy or timing based on early data (1-2 hours if needed)

    Week 3 total time investment: 3-5 hours

    Week 4: Full Launch and Planning Next Automation

    Days 22-24: Scale to full list

    • Activate automation for all appropriate contacts (30 minutes)
    • Announce to staff that system is live (15 minutes)
    • Continue monitoring performance (15 minutes daily)

    Days 25-28: Plan automation #2

    • Review results from first automation (1 hour)
    • Choose second automation to build from priority list (30 minutes)
    • Begin drafting content for next automation (2 hours)

    Day 29-30: Celebrate and reflect

    • Calculate time saved and impact on no-shows or other KPIs (1 hour)
    • Share wins with team (30 minutes)
    • Plan implementation timeline for next 2-3 automations (1 hour)

    Week 4 total time investment: 7-9 hours

    Total First-Month Investment: 26-34 Hours

    Yes, it's real work upfront. But this is a one-time investment that pays dividends forever.

    After month one, maintenance is minimal:

    • 30 minutes weekly reviewing performance
    • 1-2 hours monthly making improvements
    • 2-3 hours quarterly adding new automations

    That's 6-8 hours monthly maintaining a system that saves 40-60 hours monthly in manual communication time.

    Sound worth it?

    Frequently Asked Questions About Chiropractic Email Automation

    What types of emails should I automate for my chiropractic practice?

    Focus on high-impact, routine communications: welcome sequences for new patients, appointment reminders and confirmations, post-visit follow-ups with care instructions, educational newsletters about spinal health, and re-engagement campaigns for patients who haven't been seen in 3-6 months. These emails provide consistent value while saving significant staff time.

    Start with appointment reminders as your first automation since they have immediate measurable impact on no-shows. Then add new patient welcome sequences and reactivation campaigns. Educational content and review requests can be layered in once your foundation is solid.

    The key is automating communications that happen repeatedly and predictably. One-off announcements or highly personalized messages should still be handled manually.

    How can I ensure my automated emails don't sound robotic or impersonal?

    Use personalization tokens for names and specific details, write in a conversational tone that matches your in-person communication style, and segment your audience to send relevant content. For example, send sports injury prevention tips to athletic patients and ergonomic advice to office workers.

    Include your actual photo and signature to maintain the personal connection. Write like you're talking to a friend, using contractions and casual language. Avoid formal healthcare jargon unless you use it in person.

    Test your emails by reading them out loud. If it sounds weird spoken, it'll feel robotic written. The goal is automation that feels like personalized communication, not mass marketing.

    What's the best timing and frequency for automated chiropractic emails?

    Send appointment reminders 24-48 hours in advance, follow-up care emails within 24 hours of treatment, and educational newsletters monthly. For nurture sequences, space emails 2-3 days apart initially, then weekly.

    Avoid overwhelming patients—quality and relevance matter more than frequency. The worst mistake is sending too many emails too quickly. If someone books an appointment, they don't need five emails in the first 24 hours.

    Always include easy unsubscribe options to maintain trust. Monitor your unsubscribe rate; anything above 0.5% per email suggests you're sending too frequently or with irrelevant content.

    How do I measure if my email automation is actually helping my practice grow?

    Track key metrics like open rates (aim for 20-25% in healthcare), click-through rates on educational content or appointment booking links, appointment booking conversion rates from email campaigns, and patient retention rates.

    Most importantly, monitor whether automated emails reduce staff time spent on routine communications and increase patient engagement between visits. Calculate time savings by tracking how many hours per week your team previously spent on manual appointment confirmations and follow-ups.

    Revenue metrics matter too: track no-show rate reduction, reactivation campaign conversion rates, and new patient show rates from welcome sequences. Compare 90 days before automation to 90 days after for meaningful data.

    What's the best email automation platform for small chiropractic practices?

    For solo practitioners or small practices, start with platforms like Mailchimp (free for up to 500 contacts, then $13-350/month), Constant Contact ($12-80/month), or practice management software with built-in automation like Jane App ($79-149/month) or SimplePractice ($29-99/month).

    These offer user-friendly interfaces, pre-built templates, and essential automation features without overwhelming complexity. If you already have practice management software with email capabilities, start there before paying for a separate tool.

    The specific platform matters less than actually implementing automation. Choose something simple enough that you'll actually use it, then upgrade later if needed. Perfect is the enemy of done.

    How much time will email automation actually save my practice?

    Most practices report saving 10-15 hours per week on manual follow-ups, appointment confirmations, and patient communications. The initial setup takes 4-6 hours for your first automation, but once running, automation handles hundreds of communications monthly without staff intervention.

    Break it down: If your front desk spends 90 minutes daily on appointment confirmations and 30 minutes on follow-up calls, that's 10 hours weekly. Add 2-4 hours weekly trying to reactivate inactive patients manually (if you even do this), and you're at 12-14 hours weekly that automation handles automatically.

    That time doesn't disappear—it gets redirected to higher-value activities like handling complex patient questions, improving in-office experience, or actually treating more patients. It's like hiring a part-time communications coordinator for $50-200 monthly instead of $15,000-$20,000 annually.

    Take Action: Your Free Website Conversion Analysis

    Email automation is powerful. But it's just one piece of your patient acquisition system.

    Your website, your content strategy, your online presence—everything needs to work together to consistently attract and convert patients.

    Ready to turn your practice's digital presence into a patient-generating machine? Let's identify exactly what's holding you back.

    Free Website Conversion Analysis — Get a personal walkthrough showing the 3 biggest problems costing you clients (plus instant case study)

    We'll analyze your current digital foundation, identify your highest-impact opportunities, and show you exactly how practices in your market are attracting 15-25 qualified patients monthly through strategic marketing automation and content systems.

    This isn't generic advice. It's a custom analysis of your specific situation with concrete next steps.

    Get your free analysis here.

     

    To your dreams...

    Gerek Allen profile picture

    Gerek Allen

    Co-Owner iTech Valet

    Entrepreneur, patriot, CrossFit junkie, IPA enthusiast, loves to travel to tropical destinations, and knows way too many movie quotes.

    About iTech Valet

    iTech Valet specializes in web design and content marketing for online entrepreneurs who want to share their expertise.

    Services Include:

    • Web Design
    • Graphic Design
    • Sales Copy
    • Funnel Building
    • Authority Sites
    • Membership Sites
    • Course Creation
    • Email Systems
    • Content Marketing
    • Competitive Analysis
    • Tech Integrations
    • Strategic Planning
    (20251117) iTechValet_Free Audit_reviseds (Update)-57
    NEED MORE CLIENTS?
    Free conversion-focused analysis uncovers the 3 biggest problems killing your bookings — we'll walk you through your results personally

    Why visitors leave without booking

    What's broken on mobile devices

    Missing trust signals costing you clients

    Where you rank vs local competitors

    How to get more calls this month

    Identifying competitor advantages

    621 Enterprises, Inc. | Copyright 2022 | All rights reserved